This position is for our site project in Bac Ninh, we provide daily shuttle bus for employees from Ha Noi.
Description of the organization’s expectation:
It is important that all IG Asia Vietnam employees have a clear understanding of the expectations of their duties and responsibilities. This job description outlines the major responsibilities for this role and is a guide to the employees, and their managers, as to their overall responsibilities. The employee recognizes that they may be required to undertake work that is outside of the specifics of this job description from time to time, as required and requested to do so for the good operations of IG Asia Vietnam, and they agree to undertake all reasonable and lawful instructions provided to them.
Job Description
• Coordinate with Architect Designer and Sub- Contractors/Suppliers to ensure all related issues of ELECTRICAL works are addressed as per requirements of the project.
• Ensure that all ELECTRICAL work is in conformity to standard and specification. Interpret specifications and discusses deviations from specified civil procedures to ensure full compliance with QA/QC inspection plans and procedures.
• Day to day supervision, monitoring and correction of ELECTRICAL works to ensure the construction compliance with the Master Schedule, Specification and Design approved.
• Review and comment shop drawings, as- built drawings submitted by ELECTRICAL Sub- Contractors and assist PM for approving.
• Support PM for receipt, logging and distribution of drawings, specifications, shop drawings, color schedules, orders, site instructions, consultant reports, materials tests and equipment tests, inspection reports in accordance with standard procedures.
• Key performance metrics & checklist for the construction the project includes all disciplines and will be established according to each stage of the construction from design, material move- in to site, installation and T&C. Quality assurance at each stage of the construction project as follows:
• Testing & Commissioning: T&C plan shall be made to ensure the work performance of each package shall meet with specification/quality standards
• Material move- in to site: All materials moving- in to site shall be checked/inspected at the main gate prior to moving- into the construction site. Criteria and checklist to perform the inspection shall depend on each work package.
• Submittal: All sample materials and support documents will be submitted and get approval prior to commencement of the works. There will be dedicated space for material samples and cabinets for submittal document storage.
• Method of Statement (MOS): Depends on each work packages, Sub- Contractors/Suppliers shall develop and submit the Method of Statement describe how the work will be performed, preparation steps, materials shall be used, sequence of work, inspection and T&C. The ELECTRICAL ENGINEER will review, provide inputs/comments and approve prior to commencement of the works.
• Shop drawing: All works on site require shop drawings to be submitted, reviewed and approved before carrying out the work.
• Quality Interval check: During work performance, The ELECTRICAL ENGINEER shall review the work performed by Sub- Contractors/Suppliers regularly to ensure conformity to specification/quality standards. Any deviation shall be documented and discussed before continuing the next step of the work.
• Quality Metrics & Checklist of all disciplines shall be developed and agreed upon with each package before commencement of the work:
Electrical/Automation Cable, Tray/conduct, Transformer, MSB, DBs, Lighting, ELV, Software…